The base course material according to aci 302 concrete floor and slab construction should be compactible easy to trim granular fill that will remain stable and support construction traffic aci 302 recommends material with 10 to 30 fines passing the no.
Garage slab siding first course.
This chalk line should be level and a consistent distance from the eaves or the top and bottom of the windows.
The top side view is the wrong way to build.
From the top of this row and stretch a string line across the deck.
The bottom of the starter strip the part the bottom panel hooks on to should be at least 1 in.
Ideally you d want at least 6 inches of slab exposed between the bottom of the siding and the start of the soil.
Nail a piece of plywood about 3 5 inches 89 mm thick along the top of the chalk line this will hold out the bottom of the first row of siding.
100 sieve with no clay silt or organic materials.
Maintaining good clearances between finish grade and siding materials of all kinds is crucial to preventing this kind of damage.
Snap a level chalk line for the first starter strip at the base of the wall no less than 8 inches above ground level after determining the lowest corner of the house.
Most suppliers sell two sizes of starter 2 1 2 in.
Below the top of the foundation but the lower the vinyl siding is installed the better.
Attach the starter strip to the plywood but don t nail it so tightly that it will restrict the strip s movement.
It protects the sheathing from rain snow and pests.
Begin by installing the first row of siding on both sides of the deck.
To provide a common reference point measure up 8 in.
In most cases it doesn t make any difference whether the siding is wood vinyl aluminum stucco or brick.
Spend the extra few bucks on the wider stuff and start your siding a bit lower.
Vinyl siding starter strips.
These can be either cast concrete extensions of the foundation walls or a couple courses of concrete block with at least the first course filled anchored to the slab in the usual manner.
This is where the new siding will begin.
The cross section at the bottom is the best way to build.